Fire-rated shutters in Kettering start from about £3,200 plus VAT for a standard opening, with a free survey and a written quotation before anything is ordered.
Around Kettering, a surveyor measures the unit before anything is priced so the fire-rated shutters arrive made to fit.
Planning rules in Kettering
North Northamptonshire Council decides planning in Kettering. A straight replacement is normally permitted, though external shutters and lit signs normally need approval. The survey confirms which rules apply.
What it costs in Kettering
Guide price: from £3,200 plus VAT for a standard opening. The real figure comes from the survey measurements. The written quotation is valid for 90 days.
From order to fitted
Lead time is typically 4-6 weeks after survey. The install itself rarely takes more than two days for a standard opening. Early starts and closed-day fitting are both possible.
The product
A fire shutter holds a compartment line for its rated period and closes automatically when the alarm panel signals. You can specify tested and certified as a complete assembly; drops automatically on a signal from the fire alarm panel.
Coverage
Our Kettering jobs sit within Northamptonshire across the NN postcode district, so the team is regularly nearby in Northampton, Corby and Wellingborough.
FAQs
Who carries out the work?
Work is carried out by our installation team and approved installers working under S&K Glazing Limited, which contracts with you and is responsible for the job.
Do you cover the whole of Northamptonshire?
Yes. We cover Kettering and the rest of Northamptonshire, including Northampton, Corby and Wellingborough.
What guarantee do I get?
Every installation comes with a written guarantee, and manufacturer warranties on hardware, motors and finishes are passed to you. The terms are set out on your quotation.
Can you match the units either side?
On a parade where the landlord wants a consistent frontage, we work to the same section profile and colour reference so the unit reads as part of the row.