Why buy a shopfront and shutter as one job?

Planning a shopfront and shutter as one job means one survey, one drawing, one fixing plan and one point of contact. On a 3.0 x 2.6 m opening, an aluminium frontage with a hidden electric shutter is a guide of £5,514 to £6,954 inc VAT (£4,595 to £5,795 plus VAT). The box, guides and frame are designed together, so nothing gets bolted on afterwards.

Dark grey aluminium shopfront on a red brick terrace with a cobalt blue electric roller shutter raised halfway

Why plan a shopfront and shutter as one job?

Because the shutter depends on the frontage. The box needs depth above the frame, the guides need solid fixings on both sides, and the bottom rail needs a level floor to land on. Draw those together and they fit. Draw them apart and someone ends up drilling into a new fascia on fitting day.

Most problems we see come from a shutter bolted onto a frontage that was never designed for it. One drawing removes that risk before anything is made.

At survey we treat the opening as one thing. We measure to the structure and not to the old frame, then check the lintel, the guide fixings and the floor level. That single set of measurements drives the frame, the box and the curtain.

What goes wrong when a shutter is added later?

The usual faults are a box that hides the sign, guides fixed into thin metal, and a bottom rail that cannot lock down. Here is what that looks like on a real frontage:

  • A box on the face covers part of the fascia, so the sign has to shrink or move.
  • Guides land on the aluminium frame or on soft brick, and the shutter rattles or pulls away over time.
  • Nobody checks the lintel, so the box hangs off a timber fascia.
  • The door handle or an outward-opening door sits in the path of the curtain.
  • A sloped threshold stops the bottom rail sitting flat, so the lock will not engage.
  • When something fails, the shopfitter blames the shutter firm and the shutter firm blames the shopfitter.

How much does a shopfront and shutter cost together?

On a 3.0 x 2.6 m opening, a combined job costs £4,554 to £9,834 inc VAT (£3,795 to £8,195 plus VAT), depending on the frontage and the shutter you choose.

Combination, 3.0 x 2.6 mInc VATPlus VAT
Aluminium with manual shutter, box on the face£4,554 to £5,754£3,795 to £4,795
Aluminium with hidden electric shutter£5,514 to £6,954£4,595 to £5,795
Frameless glass with hidden electric shutter£7,794 to £9,834£6,495 to £8,195

A box on the face is the lowest-cost arrangement and the fastest to fit, and a manual shutter suits a small opening. On a wider frontage, or one that staff open alone, price the electric version too.

These guides assume a standard colour and easy access. Removing the old frontage adds about £336 inc VAT (£280 plus VAT), and a scaffold or lift adds about £420 inc VAT (£350 plus VAT). Our prices page lists the other extras, and the price calculator works one out for your own opening.

What does one contract cover?

One contract covers the whole frontage, from survey to sign-off. In practice that means:

  • One survey, measuring the structural opening for both the frontage and the shutter.
  • One drawing, showing how the box, guides and glass fit together.
  • One fixing plan for the box, the guides and the fascia.
  • One itemised written quotation, valid for 90 days.
  • One point of contact, and one company to call if something needs attention.

Your contract is with S&K Glazing Limited. The work is carried out by our own team or by subcontract installers working under our contract. The written guarantee and manufacturer warranties are set out on the quotation.

Where should the shutter box go on a new shopfront?

Behind the fascia where the depth allows. This adds about £384 inc VAT (£320 plus VAT) compared with a box on the face, and only the guides show when the shutter is open. A new frontage is the right moment to do it, because the head detail can be drawn around the box.

A concealed shutter is still an external shutter, so plan on a planning application. An internal shutter sits behind the glass and leaves the street view unchanged, but the glass stays exposed to attack.

Does one job mean one planning application?

Usually, yes, if you apply for both at once. One set of drawings shows the frontage and the shutter together, and the council sees the finished result. Both are development under section 55 where they change the look of the building. Shops have no permitted development right for either item, so an external job of this kind usually needs an application.

Signs are a separate matter, under the advertisement rules. Building control is separate as well. Your quotation says who deals with each one. Our planning pages set out your council's position.

How long does a combined job take?

A combined aluminium job takes 3 to 4 weeks to make after drawing sign-off, then 1 or 2 days to fit on a standard opening. We order both items from the same survey, so the shutter arrives sized to the new frame. The fitting runs as one sequence too: frame, box and guides, then curtain. You are not booking 2 trades and waiting between them.

Frameless glass takes 4 to 5 weeks to make, and steel takes 5 to 6 weeks. Our project timeline sets out each stage.

Can I fit the shopfront now and the shutter later?

Yes, and tell us at the start if you might. We can draw the head of the frame to take a box later and note where the guides will land. That keeps the option open without paying for the shutter now.

If you are keeping an existing frontage and only want a shutter, we still survey the whole opening first. Our guide to shutter costs has the prices.

Common questions

Is it cheaper to buy them together?

Not as a set rule. The combined guide ranges are on this page. What you gain is one drawing, one fixing plan and one company responsible for how the two work together.

Who is my contract with?

Your contract is with S&K Glazing Limited, trading as Shopfronts and Shutters. The work is carried out by our own team or by subcontract installers working under our contract.

Do I need 2 surveys?

No. One free survey measures the structural opening for both the frontage and the shutter. It carries no obligation.

How do I pay for a combined job?

Payment is a deposit on acceptance, a stage payment on the first day of installation, and the balance on satisfactory completion, as set out on the quotation. Nothing is ordered until you accept.

Which areas do you cover?

We work on commercial premises across 12 Midlands counties, from the West Midlands and Staffordshire to Lincolnshire and Rutland.