How do you match brand colours across sites?
Give us the RAL references from your brand guide. Any RAL colour adds about 6%, and dual colour about 10%. Approve one sample on metal, because a colour on screen rarely matches powder coat. If your guide gives only a print colour, we need a RAL match agreed before the first order, so that frame, box and shutter all read the same on every site.
What goes in a repeat specification?
One page that every drawing starts from:
- Frame system and colours.
- Shutter type and how it is operated.
- Box position, and how to handle a shallow fascia.
- Glass type, and where laminated is needed.
- Sign zone and lighting.
- Door gear and manifestation.
Keep a short list of allowed variations. Sites differ, and a list saves a phone call on every job.
Can one contact run every site?
Yes. You get one point of contact, and each site gets one survey, one drawing and one fixing plan. The contract is with S&K Glazing Limited, and work is carried out by our own team or by subcontract installers working under our contract. We cover 12 Midlands counties.
How long does a rollout take?
Allow 3 to 4 weeks from drawing sign-off for a frontage and shutter package, plus whatever time consents take. Do not set an opening date before consent is in hand. A typical order for each site is:
- Survey the opening.
- Sign off the drawing.
- Get the landlord's consent.
- Apply for planning, sign consent and building control where needed.
- Accept the quotation, and we order.
- Install, test and hand over.
See the project timeline.
What happens when the brand guide meets a conservation area?
The specification has to bend. External shutters are much harder to get there, so a shutter or grille behind the glass may replace the standard. Deemed consent for an illuminated fascia is not available in a conservation area, so the sign may need an application or a change of lighting. Tell your franchisor early. See the conservation area guide. This is general guidance for England, not legal advice.
What should you ask your insurer?
Ask whether one standard covers every site, and get it in writing.
- Does a group policy set one standard for all sites?
- Do some sites carry different conditions by stock or location?
- If your insurer asks for a rating, tell us before ordering and we will price a product certified to it and give you the certificate.
What should you specify, and what should you avoid?
Specify one standard with room for variations, and avoid skipping the survey.
- Specify: a survey at every site, even when the units look identical.
- Avoid: copying one drawing across sites. Lintels and fascias differ.
- Avoid: ordering shutters first and working out the frontage later.
- Avoid: assuming consent. Part 7 gives no right for shop fronts or shutters, in any town.
The survey and quotation for new work are free with no obligation. Talk to us about your sites.
Common questions
Do you offer a price for several sites?
Each site is quoted on its own survey, with every item shown, so you can compare sites line by line.
How are payments handled across sites?
Each quotation sets out a deposit on acceptance, a stage payment on the first day of installation, and the balance on satisfactory completion.
Sources
Related services

Shopfront and shutter packages
A new frontage and its shutter, designed and fitted as one job.
from £4,074 inc VAT
Aluminium shopfronts
Powder-coated frontages, made to the measured opening.
from £2,940 inc VAT
Concealed roller shutters
The box sits behind the fascia, so the street never sees it.
from £2,124 inc VAT