0800 088 6248 Get a price

Do you need planning permission to change a shopfront?

Changing the look of a shopfront in England usually needs planning permission, and no permitted development right covers it. Work that does not materially affect the external appearance can fall outside planning control, but councils differ on where that line sits. Get the council's answer in writing before you order anything.

Slim green aluminium shopfront in a Georgian brick building in a cathedral town

Do I need planning permission for a new shopfront?

Usually, yes, because a new shopfront alters how the building looks from the street. That makes it development under section 55 of the Town and Country Planning Act 1990. That covers a new frame, a moved door, a different stallriser and a deeper fascia.

The council makes the decision, and it will look at the frontage against its neighbours and its local design policy. Lewisham's test is any alteration "that would change the shop's appearance". Other councils use similar wording, and each one reads it in its own way.

Planning officers look at the whole street. They compare your proposal with the neighbouring frontages, the fascia line, the proportions of the building above and any local shopfront design guide. A design that keeps the street's fascia height and a proper stallriser usually gives you an easier case.

Is there a permitted development right for shopfronts?

No permitted development right covers a shopfront in England. Class A of Schedule 2 Part 7 lets shops make some extensions and alterations, but A.1(h) excludes "the insertion or creation of a new shop front or the alteration or replacement of an existing shop front".

A.1(e) goes further. Class A rights are not available for any alteration on article 2(3) land, which includes conservation areas. So you cannot rely on a general shop alteration right for this work anywhere in England.

Which shopfront changes usually need permission?

Most visible changes do. The table below is a guide to how these jobs usually play out. Your council decides.

ChangeUsual position
New frontage in a different material or layoutPlanning permission usually needed
Moving the door or changing its widthPlanning permission usually needed
Changing a stallriser, fascia depth or pilastersPlanning permission usually needed
A different frame colourAsk the council, as it can change the appearance
Replacing a frame in the same style and colourAsk the council in writing
Replacing broken glass in the existing frameUsually outside planning, unless the look changes
Listed building, any of the aboveListed building consent may also be needed

Is a like-for-like shopfront replacement exempt?

Not automatically, because no rule exempts it. Since no permitted development right exists, the only route is that the work does "not materially affect the external appearance" under section 55(2)(a)(ii). That is a judgement about your frontage, and it has no fixed test.

A small change in sightlines can matter. Modern aluminium sections, a different door or a new glazing bar can make a like-for-like job look different on the street. Councils differ, so write to the planning department with photos and a drawing, and keep the reply.

Send photos of the existing frontage, a drawing with sizes and materials, and one direct question: does this need planning permission? If you need a formal answer, ask about a lawful development certificate.

What happens if I change a shopfront without permission?

The council can take enforcement action for 10 years after the work is substantially complete, under section 171B. The 10-year period has applied in England since 25 April 2024. Works finished before that date may fall under transitional rules, so take advice if yours did.

The cost falls on you. A frontage that has to be altered or taken out means paying twice, and the question can come up again when you sell the lease or the building. If you have taken on a lease and suspect a past tenant changed the frontage without permission, ask your solicitor to look at it before you spend money on the unit.

What other consents can a new shopfront need?

Up to 4 others, depending on the job. Check each one before you order.

  • Building regulations. Replacing a whole unit, frame and glass, is building work. See our guide to building regulations for shopfronts.
  • Advertisement consent. Fascia signs have their own rules. See our guide to shop signs.
  • Listed building consent. This applies to alterations that affect the character of a listed building. See our guide to heritage shopfronts.
  • Your landlord. Most leases need written consent for alterations.

What does a shopfront planning application need?

It needs the national items, plus drawings that show the street view before and after. Those national items are the form, fee, location plan, site plan and ownership certificate, listed in GOV.UK's guidance.

For a shopfront, councils commonly look for existing and proposed elevations, a section through the head and the stallriser, and the materials and colours. Check your council's local list first. An application for listed building consent also needs a design and access statement.

If you plan a shutter too, show it on the same drawings. The application then deals with the whole frontage, and you avoid a second application later. Our guide to shutter planning has more on this.

How do I start?

Start with our council-by-council planning pages, then book a survey. The survey is free for a new shopfront, and an aluminium frontage starts from £2,940 inc VAT (£2,450 plus VAT). Nothing is ordered until you have accepted the quotation, so you can wait for the council's decision first. Bring any past planning decisions on the unit to the survey, including refusals, because they show what the council has already said about that frontage. Our project timeline shows how planning fits in.

Common questions

Do I need planning permission to change a shop door?

Usually, if the change is visible from outside and alters the look of the frontage. A direct swap may fall outside planning, but that is for the council to say. Ask in writing first.

Do I need permission to paint my shopfront?

It depends on the building and the council. A change of colour can affect the appearance, and a listed building or a planning condition can change the answer. Ask the planning department.

Can my landlord apply for planning permission instead of me?

Yes. Either of you can apply. Whoever applies must complete the correct ownership certificate and notify any other owners.

Does a new shopfront need building regulations approval as well?

Usually, yes. Replacing the frame and glass together is building work, and building control bodies treat most shopfront jobs as needing approval. Planning and building control are separate.

Should I wait for planning before accepting a quotation?

You can. Your quotation is valid for 90 days, and nothing is ordered until you accept it. If the planning decision runs past that, ask us to check the quotation.

Sources

Related services

Find out what your frontage will cost

Free survey for new work across the Midlands, a written itemised quotation, and no obligation.

WhatsApp
Call usGet a price